It is an industrial park built in Chau Son Ward, Ninh Binh Province.
- Operating time: Until 10/2068
- Total land area: 171,596 hectares
- Number of registered projects: 49 projects
- Occupancy rate: Old industrial park and expanded industrial park is 100%
- Unit price of land lease with infrastructure: Contact
Detailed description
|
LOCATION |
|
|
Address |
Lot CN16.2, Chau Son Industrial Park, Chau Son Ward, Chau Son Ward, Ninh Binh Province. |
|
Hanoi Center |
58 km from Hanoi city center |
|
Air |
80 km from Noi Bai International Airport |
|
Road |
Distance from National Highway 1A: 1km; Adjacent to National Highway 1A bypass |
|
Riverway |
Distance from Thinh Chau port on the Day River: 500m |
|
Nearest seaport |
Distance from Hai Phong port: 100 km, 150 km from Cai Lan port (Quang Ninh) |
|
Nearest Railway Station |
Distance from Phu Ly station (on the North-South railway): 3km |
|
Factory floor plan |
Total factory area: 22,891 m2 (05 factories) |
|
INFRASTRUCTURE |
|
|
Roads and Electrical Lighting |
The internal road system is reasonably designed to ensure that vehicles reach each factory easily and conveniently. Electric lighting systems are installed along traffic routes and internal roads. |
|
Power supply |
The power supply is supplied continuously and stably from the 110/22 KV substation. |
|
Water supply |
The capacity of 31,000 m3/day-night ensures to fully meet the demand for clean water for investors. The water supply system is led to the foot of the factory. |
|
Telecommunications and Internet |
Ready to meet 9-10 lines/ha, and at the same time meet the needs of providing domestic and international postal services Underground fiber optic cable system is directly connected to the fence of enterprises |
|
Waste disposal |
Solid waste from factories in the industrial park will be sorted, collected and transported by a fully functional unit for treatment |
|
Wastewater and waste treatment |
All industrial wastewater and domestic wastewater are treated through the septic tank system before being discharged into the general wastewater drainage system of the industrial park. The wastewater treatment plant was built with a treatment capacity of 2,900 m3/day-night in Phase 1 and will increase the capacity when necessary. |
|
Drainage |
Rainwater and wastewater drainage systems (industrial wastewater and domestic wastewater) are built separately. Rainwater is collected through sewer systems and drained into rivers in the area. Wastewater is collected to the wastewater treatment plant of Chau Son Industrial Park. |
|
Fire Prevention and Fighting |
Water supply systems and fire hydrants are arranged along the workshop and internal routes |
|
Environment and greenery |
The green tree system accounts for 10% of the entire factory project, combining concentrated trees and trees along the roads to create a common landscape for the industrial park. |
|
Factory rental price and utility fee |
|
|
Factory |
Factory unit price: 4.0 USD/m2/month (including: factory, management fee, fire protection system outside the factory). Garage: 1.5 USD/m2/month Minimum lease period: 05 years Deposit: minimum 06 months factory rent Payment method: 01 year/time |
|
Electricity price - voltage level below 6KV |
1. Normal hours/ 1,685 VND/Kwh Applicable time: - From Monday to Saturday: 04:00 - 09:30, 11:30 - 17:00, 20:00 - 22:00 - Sunday: 04:00 -22:00 2. Off-peak hours: 1,100 VND/Kwh Applicable time: All days of the week: 22:00 - 04:00 the next morning. 3. Peak hours: 3,076 VND/Kwh Applicable time: - From Monday to Saturday: 09:30 - 11:30, 17:00 - 20:00 - Sunday: no peak hours. |
|
Current water prices |
11,500 VND/m3 equivalent to 0.49 USD/m3 (Excluding 5% VAT). |
|
Wastewater treatment fees |
9,600 VND/m3 equivalent to 0.41 USD/m3 monthly payment. |
|
Cost of telephone, internet, other services |
According to the regulations of the suppliers at the time of use |
|
Reference salary |
Minimum wage in region 3: 147.5 USD/month) |